Each group is required to prepare two types of
project report for their proposed ‘Amphitheatre Stage’, which are:
- i)
Progress Report
- ii) Design
Proposal Report (final report)
i) Progress
Report
§
As the project runs for 6 weeks, each group is
required to produce a progress report for the project on weekly basis. The
report should consist the following component:
1) discussion
on the progress of that week;
2) discussion
of the problem that have arisen;
3) discussion
of work lies ahead, photos of current progress;
4) Schedule
of work and cost involved.
§
The progress report should be in printed A4 size
format (font Arial 11; 1.5 spacing, 5-8 pages).
§
Submission of progress report should be made on
weekly basis to the Studio master and some of the groups will be selected to
present their progress at the lecture hall during every Monday Studio Session.
ii)
Design
Proposal Report (final report)
§
The proposal should consist of the following
elements/components:
i)
Purpose, goal and objective
ii)
Background study and site analysis
iii)
Proposed design development
iv)
Construction method, material selection &
basic
v)
Building services
vi)
Elemental Cost Analysis (ECA)
vii)
Model Cost Estimate
viii)
Project Scheduling
- For the ‘Proposed Design
Development’ part, students are encouraged to just reduce the A1 size
presentation drawing board to A3 size presentation drawing paper and attached
it as Appendix A in the report.
- For the construction method, students need to
mention the type (traditional/conventional, modular, IBS, mixed etc.), propose
the superstructure and substructure used and explain the rationales why the
method of construction is selected.
- For
the ‘material selection’, students need to mention the material selected
for roof, floor area, stage background (if any) and all applied structures
(column, roof structure, shading device, base etc.) together
with the detailing of structural joints (3 details).
-
For building services, students should focus on
lighting system, sound and Public Address (PA) system.
- As simple estimation budget for the stage
construction, each group need to provide an Elemental Cost Analysis (ECA) that
consider the structure, finishes and basic services of their project.
- In addition to ECA, each group also needs to
provide estimation cost for their physical scale model construction (Model Cost
Estimate) of their STAGE.
- In the report, each group needs to provide its
own project scheduling and management plan.
- Besides, each group also needs to state the role
of each group members, organization chart of the group and simple gantt chart (reporting
on the project).
- The submission for this Project 6b(ii) (Design
Proposal Report) is one complete typed report (printed in A4 format; font Arial
11; 1.5 spacing, 15‐20
pages).